Continuous World-Class Performance
| 1989 1992 |
Invented
and Patented ERD Technologies
Invented more than 10 drilling technologies designed
specifically for extended reach wells in the course
of four years, propelling the company further
into the extended reach drilling market. |
| 1989 |
First
Negative Weight Wells
Helped develop technologies to drill the first
negative weight extended reach wells. These technologies
are still being used today for negative weight
wells. |
| 1992 |
First
Complex Well in Australia
Supervised the successful drilling of a complex
well in Australia that was considered impossible
to drill. The project was completed on time
and under budget.
|
| 1996 |
Engineering
Excellence Award
Received the Engineering Excellence Award from
the Australian Institute of Engineers for the
companys contributions and accomplishments
in the field of extended reach drilling. |
| 1997 |
Corporate
Relocation to Houston, Texas
As the companys technological advances became
more greatly recognized, K&M Technology relocated
its central operations from Perth, Western Australia,
to Houston, Texas. |
| 1998 |
First
Edition of Extended Reach Textbook Published
Drilling Design and Implementation for Extended
Reach and Complex Wells written, gaining industry-wide
acceptance from major oil and service companies
worldwide. |
| 1998 |
Longest
Deep Water ER Well in North America
Assisted in drilling the longest extended reach
well in North America. K&M Technologys
training, design and surveillance services helped
surpass the projects estimated schedule
and cost. |
| 1998 |
First HERDIT
Schools
K&M began offering extended reach and complex
well training to the industry. These programs
are now recognized among the best drilling operational
training programs in the industry. |
| 1998-99 |
Two Longest
Reach Wells in North America
K&M provided design services, training and
wellsite surveillance to these projects that set
the benchmark for extended reach wells in North
America. One of the projects had attempted to
drill the wells twice and had failed prior to
K&M involvement. |
| 1999 |
Fit-for-Purpose
Well Designs for Small Rigs
Drilled a 21,000-foot extended reach well at 80o
using the operators existing rig package,
which used two 1,000 hp pumps, a 1,500 hp draw
works and a portable top drive. Continue to design
programs using operators existing rigs. |
| 2000 |
2000 Began
applying ERD practices back to standard deviated
wells for performance improvement |
| 2001 |
2001 Deepwater
Performance Record in GOM
Working with Conoco's Magnolia drilling team to
bring the Magnolia 3 well in at 1.8 days/1000'
BML. The fastest drilling time to that depth in
the Gulf of Mexico. This represented a savings
of US$4.7 million to Conoco over AFE and ~US$7.0
million over their previous best performance.
Extended Reach Performance Record in GOM
Working with a major operator, the longest extended
reach well in the Gulf of Mexico at this time
was brought in World Class time saving the
operator ~US$4.0 million over AFE. |
| 2002 |
2002 First
Floated casing runs from Semi-submersible
Working with ChevronTexaco in the North Sea, a
comprehensive planning effort was put into the
very challenging 9-5/8" casing run for the
Captain Project. This floated casing run represents
the first ever attempt at floating casing from
a floater. |
| 2002 |
Horizontal
Drilling Performance Record - Venezuela -
Working with Ameriven (ChevronTexaco) in Venezuela,
K&M helped this team to eclipse its existing
record of 8,545 ft in 24 hrs with its new record
of 8,900+ ft in 24 hrs. |
| 2003 |
BP Chirag A18 – Azerbaijan
Successfully drilled & completed despite failures on previous two wells |
| 2003 |
Hibernia B16-36
Well was successfully drilled and completed. K&M was involved from initial feasibility, detailed planning, and training. |
| 2003 |
Captain B development in UK North Sea
First floated casing runs from a floating rig. |
| 2003 |
Ringhorne ER Project in Norway
Very complex T&D and ECD project. First floated casing in Norway. Involved from initial feasibility to implementation. |
| 2003 |
Hibiscus C2
Well was successfully drilled and completed in Trinidad despite failure on previous 2 attempts. The key was reformed drilling practices. |
| 2003 - 2004 |
Sakhalin Island
Drilled and cased first two wells with longest well drilled to XXm. K&M did everything from initial feasibility, detailed planning, rig specification, and training. |
| 2004 - |
Chevron Petronius A9 – US GOM
Chevron called on K&M for a follow-up to the record setting A20 well drilled in 2004. The A9 well was successfully drilled to 31,481’ MD (25,647’ reach) in 1800’ of water in the Gulf of Mexico, which defines itself as the longest well in the world drilled in ≥1000’ of water. The well was specially engineered to incorporate valuable lessons learned on the A20 well, and featured a “systematic” integration of key features such as wellpath design, casing architecture, drillstring design, and a new fluids system. After the 7” liner was cemented on bottom, the Chevron Drilling Supervisor had this to say about our dedicated onsite staff that worked with rig site team throughout the duration of the project:
“…he (Tommy Bell) was instrumental in the success of not only the 7" liner job, but the entire well.” |
| 2005 - 2006 |
Shell L02FA104 – Dutch Sector, North Sea
K&M became involved in the playing stages of one of Shells most demanding HPHT/ERD wells in the Dutch Sector of the North sea early 2004. Through detailed planning, crew training, and onsite surveillance, K&M supported the operation from start to finish. The difficult drilling environment in Holland presented a few unexpected challenges during the operations phase, but were met with ingenuity and years of experience to overcome adversity. The Shell Drilling Superintendent had this to say about the onsite support provided by K&M’s Mike Broderick: “It has (the L02 well) certainly tested us all to the limit at various times, and only because of the expertise and personality of people like yourself has it be possible to overcome and deliver…I know the guys on the rig have taken may valuable lessons away from this well and many have come form you with the support of the K&M team.” |
| 2005 - 2006 |
Pohokura – Taranaki Basin, New Zealand
Years of planning led up to an innovative well design approach for New Zealand’s longest ERD wells POW-1, POW-2, and POW-3 (6445, 6985, and 7409m, respectively). Previous ERD wells drilled from land to offshore were fraught with hole problems and exorbitant trouble time. For the 2005-2006 campaign, a new approach was taken whereby the wells were slightly downsized (9 ½” instead of 12 ¼” hole), which removed contingency options, but dramatically reduced the risk of problems and the need for a contingency string in the first place. Through extensive training and onsite support, the project was completed relatively problem free, on time, and within budget. Shell Todd’s head of well engineering had this to say about K&M’s involvement…“A very worthy close out of the Pohokura drilling campaign, which has been a great operational success…..On the way to this success you managed to brake several records. I will only mention one as the list has become too long to quote. POW03 which is now the longest well in NZ at 7409m: a record which will stand for many years to come. |

Innovative Thinking
Well Casing Flotation
Devices and Method
Oil Tool Release
Joint
Hydraulic
Release Oil Tool
|
Patented Technology
|
Date Filed
|
Description
|
| Well
casing flotation device & method |
Aug 22 1990 |
An apparatus and
method of setting liner or casing strings in an
extended reach well, during oil, gas or other
well completions |
| Oil tool release
joint |
Sep 27 1990 |
A tool that releases
a downhole component from a drill string in response
to hydraulic pressure in the drill string |
| Hydraulic release
oil tool |
Oct 10 1989 |
A tool that can
be used to reduce friction between a liner and
a well bore or to release a drill string for its
removal from a well bore |
| Hydraulic release
oil tool (contd) |
Mar 26 1991 |
A tool that can
be used to reduce friction between a liner and
a well bore during run in or to release a drill
string prior to its removal from a well bore
|
| Well casing flotation
device & method (contd) |
Feb 10 1992 |
An apparatus and
method of setting liner or casing strings in an
extend reach well, during oil, gas or other well
completion |
| Hydraulic release
system (contd) |
Apr 30 1991 |
A system that
can be used to reliably release a drill string
coupled to a liner after running the liner into
a well, especially an extended reach well |
| Well casing flotation
device & method (contd) |
Aug 31 1989 |
An apparatus and
method of setting liner or casing strings in an
extended reach well, during oil, gas or water
well completion |

Global
Presence

Africa
Asia
Australia/New
Zealand
Europe
Gulf of Mexico
North America
North Sea
South America
Africa
ExxonMobil West Africa engineering design,
training and surveillance to the Jade and Zafiro Field
Developments, two of the most challenging ER developments
worldwide due to severe wellbore stability
Asia
Arco China, Inc. ER drilling rig design
calculations for use in the South China Sea
BP Indonesia engineering design to multiple
ER and complex well programs
CACT provided drilling engineering services,
hole monitoring systems and planning for an ER project
Australia/New
Zealand
Ampolex Ltd.torque and drag data gathering
criteria for tendering to mud logging companies
Apache Energy, Ltd. engineering design
and well site surveillance on various Apache ER and
horizontal development drilling projects including
Stag and Harriet Field Projects on the Northwest Shelf
of Australia.
BHP Petroleum, Melbourne drilling engineering
services for a number of BHPP drilling projects worldwide
Chevron Offshore Petroleum, Inc. senior
drilling and completion engineering for the Banzala
ER Development Project
Esso Australia Ltd. Improved drilling
efficiency by 47% on a ER program for the Mackerel
Field offshore Bass Strait compared to the previous
infill program. Also led drilling and completion engineering
for several Exxon Corp. record ER wells from the Fortescue
and Moonfish programs.
Fletcher Challenge Energy determined
feasibility and design for a world-class ER project
to develop the Pohokura Field of New Zealand.
Hadson Energy Ltd. determined feasibility
for various projects on the Northwest Shelf.
Santos Ltd. well planning and onsite
drilling engineering for the design and drilling of
the Meranji 14H horizontal well in Moomba, Australia
Shell Todd Oilfield Services provided
ER and horizontal drilling practices manual and training
for the Maui-B Development Program
West Australian Petroleum Ltd. Well
design and drilling plan resulted in completion of
an undrillable well on time and under
budget.
Western Mining Corp. Determined feasibility
of the use of horizontal and ER technologies in various
operations throughout Australia and New Zealand
Woodside Energy Ltd. engineering review
and crew training for the GWA-18 ER well
Europe
Boryslav Oil Co. drilling engineering
and operations project management for a single pad
17-well ER horizontal infill drilling program under
an environmentally sensitive area in Western Ukraine
BP Exploration well design and contingency
planning for ER wells in the Wytch Farm Field in Sunbury,
England
Chevron UK provided engineering feasibility
and design services to the Alba Development Project
Exxon Neftegas Project Services Rig
design layout engineering, well design, general consulting
for Sakhalin Island Development Project in Russia
Gulf
of Mexico
Chevron USA engineering design for various
ER projects
Conoco USA performance improvement program
for shelf and deep water groups for Arabian and Magnolia
projects. Drilling of the first appraisal well in
the Magnolia field saved $4.7 million
Exxon Upstream Development Co. surveillance
and design to the Diana Deep Water Project
Forest Oil Corp. first ER well in the
GOM in shallow sands
Nerco Oil & Gas completed to designed
TD
Texaco USA design, engineering, and
training to the Petronius Field Development
North
America
Chevron Petroleum Technology Center
David-Lynch, Inc. engineering design
for using the Selective Flotation Technique
Exxon Co. USA -- Exxon USA Hondo Platform,
longest reaching well offshore California. Also provided
design, surveillance, and training on Harmony and
Sacate ER projects; and drilling engineering and contingency
design planning for the Alabaster ER project
Exxon USA, New Orleans set corporate
and industry records for reach and performance; developed
rig upgrades and drilling/completion programs for
a small rig package
ExxonMobil engineering design for rig
upgrades and well planning for the Sacate West world-record
ER well
PanCanadian Petroleum monitoring, interpretation
and drilling engineering on a 10-well ER project under
Lake Newell from a 45-degree slant rig
Shared Services Drilling (BP & Arco)
training, engineering and wellsite surveillance services
to a number of projects including Milne Point, Niakuk,
Endicot and Red Dog Programs in Alaska
Smith International training for bit
and BHA selection for ER and complex wells; engineering
design consultation for waling bit and rotary steering
tool bit designs
Thums Long Beach Co. eliminated hammering
of casing string on S shaped ER wells
Unocal Platform Irene world records
set for horizontal displacement relative to TVD
Unocal Oil & Gas liner contingency
tools for a shallow horizontal well for Unocals
Coalinga Nose Unit.
Weatherford International engineering
design using Weatherford equipment in ER and complex
well applications
North
Sea
Esso Norway performance improvement
training and offshore surveillance to the Jotun Drilling
Project
Texaco UK engineering design and field
surveillance to the Captain Project
South
America
Total Austral S.A. offshore Tierra Del
Fuego, Argentina completed to designed TD
|
|
|