K&M Technology Group Extended Reach Drilling Engineers and Drilling Consultants

 

Press Releases - News for K&M Technology

 
The top 50 press releases in our database are displayed below.
 
5 Record(s) Found. Displaying Page 1:

Cementing in Extended Reach Wells - Part 1 of 2
Release Date: 14-Jan-03
Author or Contact: Michael Mims
Extended Reach “primary” operations are already difficult enough without stewing “remedial” operations into these wells. That statement has never been more correct than for our cementing operations. Obtaining a good primary cement job on a long string of casing in an extended reach wellbore is a considerable challenge, especially if zonal isolation is critical to the well’s success. The ...

Click to read Cementing in Extended Reach Wells - Part 1 of 2


Cementing in Extended Reach Wells - Part 2 of 2
Release Date: 14-Jan-03
Author or Contact: Michael Mims
This is the second article in a short series that will address cementing issues, from a well construction engineer’s perspective, for extended reach and complex well designs. The previous article addressed primary cementing concerns from a mechanical standpoint. This article will continue on the subject of Primary Cementing, however, we will look at cement slurry designs and advanced ...

Click to read Cementing in Extended Reach Wells - Part 2 of 2


Direction Drilling Performance Improvement - Using Today's Technology to Maximize Overall Drilling Efficiency
Release Date: 14-Jan-03
Author or Contact: Michael Mims
Introduction Directional drilling technology has come so far in the last 15 years that it is difficult to imagine drilling a long horizontal or extended reach well without the use of at least 6 high speed computers, downhole motors, fancy drilling fluids, adjustable BHAs, top drives and PDC bits. In fact, when you look at the industry’s current use of today’s technologies, ...

Click to read Direction Drilling Performance Improvement - Using Today's Technology to Maximize Overall Drilling Efficiency


Woodlands High School Sports Training Facility Gains Muscle
Release Date: 25-Sep-02
Author or Contact: Michelle White
Local individuals and businesses invest $65,000 to upgrade weight room equipment The Woodlands, Texas (Sept. 25, 2002) – The Woodlands High School students are pumped up about weight training thanks to the generosity of several local individuals and businesses. K&M Technology Group, engineering consultants for extended reach drilling, stepped up with the largest donation. Combined with generous donations from The Woodlands Operating ...

Click to read Woodlands High School Sports Training Facility Gains Muscle




Extended Reach Drilling, Complex Well, Floated Casing, Performance Improvement