K&M Technology Group Extended Reach Drilling Engineers and Drilling Consultants

K&M Technology Group ERD Course - July 13-17, 2009

Monday 13-Jul-09 8:00 AM to Friday 17-Jul-09 5:00 PM CDT

We were unable to register you for this event as the event deadline has passed or the maximum number of seats available has been reached.
Total Seats: 40
Reserved: 11

The Woodlands Resort & Conference Center

2301 N. Millbend Dr
The Woodlands Texas 77380 USA
Google Maps | Hotels Near | Yahoo! Maps | Weather Forecast
Phone: (281)367-1100

Speaker Brandon Foster

Company: K&M Technology Group

Event Description

 

KM technology - leaders in extended reach drilling implementation and education
K&M Technology -
Leaders in Extended Reach Drilling Implementation and Education

www.kmtechnology.com
 
 
Date:
July 13-17, 2009
Location: 
The Woodlands, TX
Venue:
The Woodlands Resort & Conference Center
2301 N. Millbend Dr
The Woodlands, TX 77380
(281)367-1100

Time:

8:00 am – 4:30 pm
 
Cost:
$4,500.00 (USD)

 
Need a hotel room?? Get K&M's rate at The Woodlands Resort.
Click on the following link.

Who should attend: Drilling Engineers -- Project Engineers Drilling Superintendents -- Key Rig Personnel – etc.

Reasons you should attend:

  • Your wells experience hole cleaning problems at angles higher than 40
  • Pumping sweeps and wiper trips do not seem to help
  • You have to backream to get out of the hole
  • Your extended reach wells always come in way over budget
  • You had stuck pipe and had to side-track the hole
  • You do not know why you have problems with your high-angle holes

What you will learn:

  • What’s different about ERD well design and technology
  • Torque, Drag, Buckling and Hydraulics Fundamentals and Modeling
  • Hole Cleaning and Hole Condition Monitoring and Management
  • Rig Design and Layout
  • Directional Drilling and Surveying
  • Drillstring and BHA Design and operations
  • Casing and liner design, running and cementing and Casing Flotation
To register: 
Register now or email attendee names and billing details to shonda@kmtechnology.com or call K&M at 1 (281) 298.6900
 
Course size is limited to the first 40 paid attendees.
There is a 30-day cancellation policy for all courses.

For more information about K&M’s Training Courses, visit our website at www.kmtechnology.com

Comments

5-DAY COURSE

Schedule of Activities

 

Day 1 : 8 am – 4.30 pm

  1. Introduction
  2. Worldwide ERD Achievements / Who are K&M ?
  3. What’s different about ERD ?
  4. Preliminary Well Design
  5. Torque, Drag & Buckling Fundamentals

 

 Day 2 : 8 am – 4.30 pm

  1. Torque, Drag & Buckling Modeling & Planning
  2. Hole Cleaning
  3. Tripping & Back-reaming Practices

 Day 3 : 8 am – 4.30 pm

  1. ECD Management
  2. Surge & Swab
  3. Casing and Drillpipe Wear
  4. Vibration
  5. Wellbore Stability

 Day 4 : 8 am – 4.30 pm

  1. Connection Practices
  2. Hole Condition Monitoring (including Case Study)
  3. Differential Sticking
  4. Running Casing and Liners in ER Wells
  5. Casing Flotation

 

 Day 5 : 8 am – 2 pm 

  1. Bit & BHA design
  2. Wellpath design for Systems Approach
  3. Cementing

 

Attachments
 

 Event Contact

 Event Coordinator

Shonda Booher Shonda Booher
(281) 298-6900 (281) 298-6900
(281) 298-6875 FAX (281) 298-6875 FAX
   

K&M Technology Group ERD Course - July 13-17, 2009

Monday 13-Jul-09 8:00 AM to Friday 17-Jul-09 5:00 PM CDT

Speaker Brandon Foster

Company: K&M Technology Group

Biography

Education:

B.S. Petroleum Engineering
Montana Tech

Career Summary:

Brandon began his career with Mobil International Drilling Services where
he worked as an onsite drilling engineer, responsible for torque and drag
and fluid optimization on long horizontal wells. He also developed a
probabilistic cost estimation technique which was implemented by the
Mobil affiliate and was published as an SPE paper. After the ExxonMobil
merger, he was responsible as lead engineer for well planning, design,
and surveillance of several multi-well drilling programs in West Texas
and Wyoming .

Brandon joined Pure Resources in 2001 where he worked as a drilling and
completions engineer. At Pure, he was exposed to wide variety of complex
directional and horizontal wells in West Texas, South Texas, and New Mexico.
Everything from deep HPHT and UBD wells to low-budget shallow horizontal oil
producers were common, which gave Brandon valuable hands-on design and
operational experience. Several innovative well design concepts and
development of fit-for-purpose equipment were highlights of his stint
with Pure.

In 2003, Brandon joined the K&M team, and has worked onsite on many of
our most difficult projects from the GOM, to California , to Trinidad and all
over the North Sea . For the past couple years, he has been working on
world-class ERD, deepwater, and HPHT projects for our clients around
the world, including several record-breaking ER designs and successfully
implemented projects under his belt. He is currently working major projects
in Kazakhstan , GOM, and Norway .

Brandon and his family reside in The Woodlands, Texas.

K&M Technology Group ERD Course - July 13-17, 2009

Monday 13-Jul-09 8:00 AM to Friday 17-Jul-09 5:00 PM CDT

The Woodlands Resort & Conference Center

2301 N. Millbend Dr
The Woodlands Texas 77380 USA
Google Maps | Hotels Near | Yahoo! Maps | Weather Forecast
Phone: (281)367-1100

K&M Technology Group ERD Course - July 13-17, 2009

Monday 13-Jul-09 8:00 AM to Friday 17-Jul-09 5:00 PM CDT

 
Before 6-Jul-09
Individual:
$4,500.00

 


Add to Favorites

E-mail To A Friend E-mail this event to a friend (requires login).

Extended Reach Drilling, Complex Well, Floated Casing, Performance Improvement